Detailed explanation of construction technology of wharf steel pipe piles
1. Production of pile body
(1) Material preparation: Use pipe to make the pile body, and select the appropriate type of pipe according to the design size.
(2)Dimensional inspection: Conduct dimensional inspection of purchased pipes, including outer diameter, wall thickness, length, and other indicators.
(3) Cutting: According to the design requirements, cut the pipe according to the length requirements to ensure consistent accuracy and size.
(4)Shrinking processing: Shrinking processing is performed on the end of the pipe to connect the prefabricated pile head.
2. Prefabricated pile head
(1) Design and production: According to the design requirements, prefabricated pile heads suitable for steel pipe piles are produced.
(2) Material preparation: The prefabricated pile head material is the same as the steel pipe pile material.
(3)Production process: cutting prefabricated pile head plates - processing and shaping - drilling - wire cutting
3. Drive
(1) Determine the construction plan: Determine the driving plan and sequence according to the site geology, environmental conditions, and design requirements.
(2)Prepare equipment: Select appropriate driving machinery and tools to ensure driving efficiency and quality.
(3)Construction process: Place the steel pipe pile vertically, install the prefabricated pile head at the top of the pile according to the pretreatment length and design requirements, and use driving machinery to drive the steel pipe pile deep into the ground.
4. Welding
(1) Construction plan: Determine the welding plan and time according to the design requirements.
(2)Welding quality assurance: Clean the steel pipe piles and prefabricated pile heads, and select appropriate welding machines to ensure welding quality and strength.
(3)Testing: Test the welded steel pipe piles to ensure that the quality meets the design requirements.
Tianjin Yuantai Derun Steel Pipe Manufacturing Group successfully won the bid for the power supply configuration project of the UHV transmission base in Qinghai Province, and the power engineering infrastructure AC energy storage for the photovoltaic project of the 10-million-kilowatt new energy base (one district and two parks) in Qinghai Province System, became the only supplier of structural round pipes of 130,000 tons and nearly 1 billion yuan in the early stage of the project. This project also allowed Tianjin Yuantai Derun Group to directly participate in the bidding of national key projects. Tiderun Group has the production capacity of structural steel pipes (structural square rectangular pipes, structural round pipes) and one-stop supporting service capabilities for extra-large projects.
Steel sheet pile construction sequence
Positioning and setting out-digging trenches-installing guide beams-placing steel sheet piles-removing guide beams-purlin and support construction-earthwork excavation-foundation construction (power transmission belt)-removal of supports-basement main structure construction-earthwork backfilling- Pulling out the steel sheet pile-gap treatment after the steel sheet pile is pulled out
Q1: How can I get a quotation from you ?
A1:You can leave us message, and we will reply every message in time. Or we may talk on line by We Chat / Whats app/Email.
Q2:Can I get samples before order ?
A2:Yes, of course. Usually our samples are free. we can produce by your samples or technical drawings. But the customer will pay the freight.
Q3:What product information must I provide before making a purchase ?
A3:Please provide the grade,width,thickness,and surface treatment requirement,as well as the quantities you require.
Q4:What about product pricing information?
A4:Prices vary due to changes in raw materials on a regular basis.
Q5:Can I have a visit to your factory?
A5: Of course.Our factory located at No.1,Hengtong Road,Daqiuzhuang Industrial Zone,Tianjin,China.Customers that from all over the world are welcomed to our factory.
Q6:How long is your lead time?
A6:If it is in stock, it is usually 5-10 days. Or, if there is no inventory, 15-30 days, depending on the quantity.
Q7:What are your payment terms?
A7:Payment<=1000USD, 100% in advance. Payment>=1000USD 30% T/T in advance ,balance before shippment.If you have another question, please feel free to contact us as below.